Well, I'm sitting here at the computer winding down for the night drinking a Berliner Weiss.
This morning before work, I finished with the polyurethane. All that I have left on the stand is the final assembly. It would be finished right now if the wife weren't sleeping. (I'm told that I'm loud when I use the power tools in the basement)
I hope to have the plumbing assemblies mounted to the frame sometime tomorrow. After mounting, there are only a few things left. I think I am going to buy a March Pump from Midwest Homebrew Supplies. I have devised a way to have the hot water transferred from the kettle to the hot liquor tank as well as being able to recirculate ice water through the wort chiller using a series of quick disconnects. I hope to be completely done construction by the 31st of this month.
Well, that's it for now. I will try to have a pic posted as soon as I mount the external plumbing
Monday, January 18, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment