Well this is the brewery installed the garage. The system seems to work pretty well. When testing the sytem, the only leak was from a compression fitting on the wort chiller. The only thing left to do is to install the march pump and aquire an oxygenation system. I think I am also going to buy some insulation to put around the mash tun and maybe the hot liquor tank if there is enough left over. After that, all I have left to do is brew the first batch. Tenatively, the first brew is planned to take place on 2/7!